A 480 VAC motor control center supplies a load through a breaker and a manual disconnect switch ___

A 480 VAC motor control center supplies a load through a breaker and a manual disconnect switch.

Which one of the following sequences will provide the greatest level of personnel safety when de-energizing the load for maintenance, and when re-energizing the load after the maintenance is complete?

Show Answer

Answer: B

Share your understanding of this question with the correct explanation.