A nuclear power plant startup is in progress ___

A nuclear power plant startup is in progress.

The main generator has just been connected to the power grid with the following generator indications:

20 KV
288 amps
10 MW
0 MVAR

The operator suspects the main generator is operating under reverse power conditions and attempts to increase generator load (MW) normally.

If the main generator is operating under reverse power conditions when the operator attempts to increase generator load, generator MW will initially __________; and generator amps will initially __________.

A. decrease; decrease
B. decrease; increase
C. increase; decrease
D. increase; increase

Show Answer

Answer: A

Share your understanding of this question with the correct explanation.

1 Like